Dry docking procedure pdf files

With more than 100 pages of information on successful dry docking of ships, this resourceful guide breaks down the inevitable tedious task into different parts to explain each and every aspect of ships dry docking. The defects which warrant attendance in the dry dock will be moved to a dry dock file. Some of the procedures may not apply to your specific dc and are not applicable at this time. A basic understanding of how a dock is designed and built provides insight into how and why the dock s operational limitations have. If the final docking location of the vessel on blockscradle is not on the dock floor of a certified graving dock, floating drydock, marine railway, or vertical lift, the blockcradle foundation site shall be certified separately by a professional engineer see 3. I guess you meant how is the process of drydocking a ship done. This is one of the very few resources which explains dry docking procedure from seafarers point of view.

Dry dock is a large dock made out from the shore, from which water can be pumped out in order to repair parts of the ship which are below the waterline. The sea chest is a recess in the hull of the ship that provides intake of sea water for the cooling systems in the engine room. Dry docking is the procedure performed on a ship in order to perform inspections and maintenance, especially on the parts of the ship that are submerged under water. Drydocking drydocking is a situation where your vessel is exposed to increased risk. Planning and managing a drydocking for superintendents dnv gl. Drydocking drydocking is a situation where your vessel is. Daily meeting, crew, superintendent and yard repair manager. Once the ship has finished dry docking it may not be immediately ready for normal trading. Dry docking is a method of ship repair being practiced for decades. Basic dry dock training course royal institution of. Special features dry docking is carried out twice in five years. Dry dock methods and types of drydock bright hub engineering. A visit onboard the vessel 46 months before the docking can help very much.

This is the first visit of the surveyor on the ship. Many questions can be cleared, docking jobs examined, servicessurveys confirmed and spare parts orders can be discussed it is also a good opportunity to discuss what the crew can prepare before the docking to save costs and most of all time. Dry docks should also be carried out if demanded by the classification society. Calculating block loading moment area method page 2 may 2008 the magnitude of the increase or decrease in load due to errors in height is difficult to calculate. Management is responsible for the prevention of accidents and the company will ensure that all approved safety standards and safe working methods are strictly enforced at all times. The course begins with the basics and safety concerns, and progresses through all phases of dry docking. Rules for classification and construction vi additional rules. The vehicle loader, machinery or goods can fall from the vehicle, posing a danger to the loader and anyone working in the vicinity. Aug 14, 2017 the critical point in dry docking is reached when the weight of the ship begins to be taken by the blocks. If you have the experience of dry docking of a ship, you would agree that dry docking is a great experience. The docking procedure prior entry into the dock, the shipyard would need to make the necessary keel block arrangements to prepare for the ships arrival. Dry dockingrepair specification mv sd progress vessels particulars length overall 225,00 m breadth extreme 32,20 m depth to main deck 18,00 m dwt 65. One such program is the inwater dry docking system pilot study inwater dry dock pilot to assess the effectiveness and use of inwater dry docking systems as an alternative to copper antifouling paints for reducing fouling.

When the docking work is near completion, the ships personnel as well as the shipyard personnel will need to carry out their respective checks on the vessel and around the dock area. Dry dock history, types, advantages and innovation shm. Special survey is carried out every 5 years interval. Guidelines for extended drydock interval rules and standards. Drydocking definition of drydocking by the free dictionary. In simple words, a lock is like a garage for repairing ships. Generic safe work procedures are discouraged as they may tend to overlook specific circumstances such as location, weather, knowledge and experience required, time of day, other equipment involved, etc. In a recent case a vessel was scheduled for dry docking to perform a substantial overhaul, refit and conversion works. Usually dry docking is done every 12 months to 24 months, as there could be machinery and systems that cannot be stopped while the ship is in use. For complete procedure of various dry dock operations for engine room department, check out our ebook. Obtaining good results in dry dock is not difficult provided that good painting practice is followed and proper guidance is available. Dry dock dry docking necessity and statutory requirements. This article will discuss the objectives for preparing a ship for dry docking, preparing a dry dock handbook if desired and the ship for dry dock, troublesdamages if dry docking is inadequately prepared, and procedures adopted to ensure safety in dry docking.

As a chief engineer of a vessel, he must study the time of dry docking due, verify. Dry docking planning and preparation for superintendents dnv gl. They must, however, operate their dock in such a manner as to not exceed the operational limits of the dry dock that have been set by the designer. We identify objectives by engaging stakeholders, preparing comprehensive specifications and executing the project according to plan. Many trailers are either above or below the height of the dock. Methods, devices, equipment and installations for dry docking of vessels of floating structures, i. Note that as items are added, removed, or replaced from the dry dock, the inspection checklist shall be updated to re. Dbh has identified two inwater dry docking systems fab dock and seapen. An updated survey status report of the vessel clearly indicating the previous dry dock survey and the upcoming intermediate or renewal survey on the vessel.

Firstly, in this research a generic floatinggraving docking model is constructed for the purpose of hazard identification and risk estimation. A guide to master dry dock operations deck department. This area is opened during the drydocking process for cleaning, inspecting and painting. Dry dock types dockmasters are not structural or marine engineers and are not expected to design dry docks. Minor modifications may be required to customize the dock safety procedures to individual site needs, however any such modifications must not reduce the minimum standard of control as outlined. All this is something that speaks for itself when the maintenance of the vessel is under the surveillance of your local transocean representative. During the initial dock inspection of the vessels flat bottom, it was discovered that large parts of the duct keel plating had been dented and deformed over almost its entire length. Docking plugs welded seams and butts appendages anodes rudder propeller reference points watertight and oiltight bulkheads onsite survey preparatory meeting diving personnelequipment ndt qualifications repair qualifications coast guard and osha safety regulations hull preparation cleaning method. I personally love to be on a ship due for dry dock. The company has been producing fab docks since 2011 and has recently started selling the product in the u. Prepare the docking suitable files for lock and key pdbqt files. This inspection is carried out as soon as the water is pumped out and the dock is dry, with the ships bottom scraped free of barnacle growth.

The senior officers usually the mate and the second engineer supervised by the chief engineer collate a refit list. Each participant will be provided with a copy of the textbook dry dock manual. When valves are opened, the chambers fill with water, causing the dry dock to float lower in the water. After all, you get to see things that you dont see during the routine operation of the ship. The only difference being, a lock is constructed aligning the shore for easy maneuver of the ship and sea water drainage. Underwater area is inspected surveyed and necessary repairs carried out according to classification rules. Safety and health topics shipbuilding and ship repair. This responsibility and authority is passed on to all levels of supervision. I was lucky enough to get a chance to be in dry dock in each rank i have served on.

The item listed in the checklist is not present on the dry dock. During dry docking, the whole ship is brought to a dry land so that the submerged portions of the hull can be cleaned or inspected. The process itself requires careful planning and preparation. Dry docking free download as powerpoint presentation. The vessel superintendent will be responsible of the preparation of the repair works specification. Pdf sample daily progress report for dry dock repair. A situation as shown on the right should be avoided. Sqems operating procedure optec03 vessel management rev. Prepare all the needing files for docking grid parameter file, map files, docking parameter files. Spares which do not arrive on time, specialist technicians who arrive at the wrong time, poorly detailed repair specifications, not to mention the shipyard that is ill prepared. If dry dock is poorly managed, the expenses and time can escalate and important defects may not be identified and corrected. Drydocks world dubai facilities yard site 200 hectares yard capacity dock no.

Mar 23, 2020 the duration of a normal dry docking project is 1014 days. The center of gravity begins to rise since pressure on the blocks is equivalent to discharge of the ships weight and if the center of gravity rises above the meta centre before the bilge blocks are hauled into space, the ship may list over. Dm consultings basic dry dock training is a 4day course that covers the fundamentals and calculations of dry docking. Dry docking planning and preparation for superintendents. Loading dock safety guide castell salvo loading dock. Basic dry dock training course royal institution of naval. The psc inspection of a ship in dry docks requires careful consideration and professional judgment bearing in mind that the ship may be undergoing statutory surveys.

Iw survey can be performed in lieu of the dry docking at the first special survey. This report summarizes the installation, maintenance, and removal of an inwater dry dock during a oneyear trial period. Rudder, tailshaft and propeller are inspected, cleaned and also attended for maintenance and repairs. The course ends with a discussion of accidents and incidents. This could mean that the inspection can only be completed at the end of the dry docking period after convention certificates are issued. Docking survey checklist indian register of shipping. This inspection is usually carried out during daylight hours especially after daybreak. Docking in a busy time awaiting clearance to dock in use the time at anchor effectively safetysecurity briefing onboard vessel condition for docking out to be the same as when docking in. In launching, the new or repaired ship is either floated in place or slid from its berth. Through an evaluation, we will demonstrate valueadded savings as well as resolve any uncertainties enabling both you and us to conduct efficient dry dockings in the future.

Dry docking a ship or carrying out major repairs, conversions or modifications can easily turn into a nightmare if not adequately planned. Without doubt, its a musthave for all deck officers. Feb 23, 2016 the defects which warrant attendance in the dry dock will be moved to a dry dock file. Guidelines for working in loading docks june 20 page 3 of 8 dock plates also known as dock levelers dock plates, ramps or levelers are devices used to bridge the gap between the dock and the trailer during loading and unloading.

When you sign a docking contract you confirm an order for a service to be supplied at a certain place, during a specific period of time and at a specific cost. Ensure vessel condition documented engine preparations crankshaft deflections etc planning for general services. The dry docking will then be performed at the intermediate survey at 7. Lpc 1111 dry docking responsibilities and contractual. The dos and donts for all dry docking operations provided in the guide should not be missed by shipping professionals. Dry dock is a type of onshore structures where decayed or damaged vessels are repaired, or new ones are constructed sadeghi et al. Planning and managing a drydocking for superintendents. According to a solas requirement, every sea going ship should be dry docked at least twice every 5 years. Prepare a ship for dry dock bright hub engineering. Both under the vessel as on the side there is space to work. The contents of the dry dock repairs is updated to include all the particulars and plans relevant to the repair or maintenance. Apr 10, 2016 if you have the experience of drydocking of a ship, you would agree that dry docking is a great experience. A floating dry dock is a type of pontoon for dry docking ships, possessing floodable buoyancy chambers and a ushaped crosssection.

The dry docking activity of cargo ships on a regular basis is a requirement for efficient and safe operation of ships and has two main objectives which are as follows. Loading dock safety guide bay and the vehicle and cause the dock plateleveller, which provides a platform between them, to suddenly slip. Underwater area is inspected surveyed and necessary repairs carried out according to. The mandatory requirement for a ship to dry dock depends on how long the ship has been in service. Basis of the current contents of the dry docking file, a consolidated initial dry dock specification will be generated.

If the world of dry docking had one moto, it would be plan, plan, plan and plan some more. During drydocking daily procedures yard safety regulations ship safety hotwork procedure enclosed space procedure firefighting and safety, crew and yard. However, if all blocks are built to strict tolerances, and a softwood cap is used to. Laundry must be kept free of dust and inspected daily. In your home folder you will find the docking folder under which are saved all the calculations already done for you. Ventura costs estimate 12 ship acquisition cost alternative.

Mar 23, 2020 handling of agency requirements for post docking through our global network. The vessels master should decide the composition and duration of the watch. When the ship is on route to the dock, communications between the ships officer and the dock manager should be established so that the required draughts and trim can be adjusted on the ship. As there might be over 200 jobs involved it will be a challenge to complete all of them within a 815 day period not unusual for a routine docking.

Pdf drydock inspection methods for improved fouling control. Drydocking and major repairs cargo ships procedure responsibilities in dry dock repair facility. Such models are subsequently demonstrated by their corresponding case studies with regards to application of fsa for ship docking evolution. In drydock there should be ample space to manoeuvre with surface preparation and application equipment. Rules for classification and construction vi additional.

In 2015, the teekay tankers team completed the largest dry docking program to date, successfully processing 17 vessels over the course of 382 days of service time. Apr 12, 2020 inspection after docking the ship in drydock scope of dry docking, inspection and repair to be carried out 1bottom inspection and corrective action as recommended by classification society surveyor. If certification is not currently on file with coast guard, the. A guide to master dry dock operations for engine room department is a downloadable ebook designed to help you understand the whole dry docking procedure is a stepbystep manner, right from the planning to sea trials. At the same time, all shipside sea valves are inspected and overhauled as required. Sqems operating procedure optec03 vessel management rev 7. A guide to master dry dock operations for deck department is a powerful guide for maritime professionals belonging to ships deck department. For reference purposes all certificates are to be marked using the applicable dry docking specification code number. Ventura costs estimate 11 more detailed estimates when more information about the manufacturing process is known, more detailed and accurate estimates of the cost can be made the labor ratios of the shipyards are a measure of their efficiency of the production process m. If certification is not currently on file with coast guard, the contractor. The list of worksrepairs to be carried out at the next dry dock will be available on board and in copy at the technical dept. Hotwork procedure enclosed space procedure firefighting and safety, crew and yard. Dry docking of vessels or flyingboats storing of vessels on land otherwise than by dry docking b63c 1500.

This list comprises all that needed to be done while the vessel. A complete guide of bringing a ship to dry dock myseatime. In dry docking, a ship is removed from the water to enable work to be performed on the exterior part of the ship below the waterline. The type of dry dock is graving dry docks, where the. If the final docking location of the vessel on blockscradle is not on the dock floor of a certified graving dock, floating drydock, marine railway, or vertical lift, the. Slmarad application form afext01 duly filled and signed by the recognized organization.

1435 317 166 1365 1079 861 1456 1327 89 1176 558 288 591 153 1033 1542 85 1613 91 1439 344 1336 489 628 393 856 669 1209 1357 1076 717 828 796 1203 559 102 588 720 890 215 1221 1156 1053